Illustrative use case

PLC / HMI / SCADA design & verification

Specifying and verifying the control system of a new filling machine before GMP use.

AutomationQuality Illustrative use case
Operators interacting with HMI panels on a cleanroom filling machine

Challenge

The vendor’s standard documentation did not cover user access, audit trail or data retention needs.

Requirement

A control system that meets process and data-integrity requirements, with documented verification.

Approach

Write a URS with data-integrity requirements, review the functional design, and plan risk-based FAT/SAT and qualification.

Process & execution

  1. 1URS
  2. 2Design review
  3. 3Risk assessment
  4. 4FAT
  5. 5SAT
  6. 6IQ/OQ
  7. 7Traceability & report

Technology / process

  • PLC
  • HMI
  • SCADA historian
  • GAMP 5

Documentation

  • URS
  • FS/DS review
  • FAT/SAT protocols
  • IQ/OQ protocols
  • Traceability matrix

Verification

Every URS requirement traced to a passed test or documented rationale.

Outcome / expected benefit

Expected benefit: equipment that enters GMP use with compliant records from day one.

This is an illustrative use case describing a typical project structure. It does not describe a specific client, product or completed engagement.